Daintree River Ferry

Program Overview

Birdon has been awarded a 20-year contract to design, build, operate and maintain a new four-lane cable ferry for the Daintree River crossing. The project replaces an aging three-lane ferry and provides a vital transport link for residents, tourists and businesses in the region.

Quick Facts

Client

Douglas Shire Council, Far North Queensland

Location

Mossman, QLD (Daintree)

Lifecycle Stage

Design, Build, Operate and Maintain

Timeline

July 2026 – December 2047

Design and Build Location

Port Macquarie

Asset

Four-lane Cable Ferry

  • Objectives

    • Replace aging ferry nearing end-of-life
    • Ensure reliable transport for approximately 700 residents and thousands of tourists
    • Support regional economic growth and tourism
    • Integrate with upgraded landside infrastructure
  • Challenges

    • Tight operational timelines and environmental constraints
    • Complex stakeholder needs including cultural sensitivity
    • High expectations for service reliability and sustainability
    • Engineering challenges due to vessel size and launch logistics
    • Seamless transition of existing ferry operations from 1 July and service delivery until new Ferry enters service in December 2027
    • Remote operating location, with extreme weather fluctuations such as heat, cyclones and floods
    • Ongoing training commitments to Ferry Operators to meet evolving safety and compliance requirements
    • Compliance with environmental requirements in a World Heritage Area

Birdon’s Approach

Birdon’s solution includes:

  • Innovative modular build to incorporate unique cable ferry design knowledge
  • Australian-built ferry at Port Macquarie shipyard New South Wales, supporting local jobs
  • Design partnerships with experienced and local designers to understand the unique operating conditions of the Daintree River
  • Integrated maintenance regime with daily, quarterly and annual checks
  • Operate to strict environmental compliance requirements in a World Heritage Area
  • Community-first operations with priority lanes and emergency access
  • Extensive Ferry Operator training programs to meet Maritime safety and compliance requirements and maintain high standards of service
  • Local recruitment solutions, which surge capacity to support peak service demand periods
  • Working closely with local tourist based businesses to support the region
  • By reflecting the textures and colours of the Daintree River setting, the new design achieves a cohesive and environmentally sympathetic presence
Daintree River Ferry
Daintree River Ferry

Outcomes & Impact

The project delivers a next-generation cable ferry that increases transport capacity, improves reliability and supports long-term regional growth.

Capabilities in Action

  • Naval architecture and cable ferry design
  • Sub-system integration and hydraulic engineering
  • Safety and reliability planning across operations
  • Lifecycle asset management across design, build, operate and maintain phases
  • Delivery of Birdon’s largest cable ferry to date at 49.8m LOA and 17.3m beam
  • Increased vehicle capacity to 36 vehicles, up from 27 on the existing ferry
  • Unbeaten service availability at >99%
  • Reduced queue lengths and wait times through increased capacity
  • Integration with $9M landside infrastructure upgrades
  • Delivery under ISO 9001, ISO 14001 and ISO 45001 certified systems
  • Compliance to AMSA Maritime Operating requirements
  • Environmental Management Plan implemented to support ongoing operations

Move Forward With Birdon